top of page

TIYC Clubhouse Update

Our clubhouse is looking better every day. The siding is almost complete, the electricians have almost finished the rough in wiring; the rough in HVAC and plumbing have been completed. They should be installing the drywall next. Here are some pictures of the building inside and out. Thanks to everyone for making this happen!

The picture above shows the pool equipment building and the street side of the clubhouse.

Street side from our parking lot.

Side of building from dry stack.

Top floor deck showing french doors and windows.

Top floor main room with vaulted ceiling and kitchen area.

Featured Posts
Recent Posts
Search By Tags
No tags yet.
bottom of page